CASE STUDY
Centene University & Daycare
The Need
This project involved installing insulation in an existing historical building and addition for a large educational center in downtown Clayton. Sound attenuation was a key client need, since the university wanted to ensure privacy and security from room to room.
The Goley Solution
This project required a mobile and agile crew that could adapt to timeline shifts and work in a fast-paced setting.
Goley’s comprehensive solution included:
- Stocking material multiple stories in the air and pinning material to substrates rather than placing between framing members
- Applying insulation behind crisscrossed framing
- Applying R30 roll batt insulation on a concrete floor rather than blowing
- Pinning R30 batts to the attic side of mechanical mezzanine walls
- Installing R19 insulation in walls, as well as a large amount of head of wall sealing, edge of slab firestopping, and mineral wool
Goley went above and beyond to provide:
- Necessary manpower: To accommodate the fast pace of the job, Goley supplied additional manpower and hours to ensure the high-performing products were applied on time and within budget. Additionally, because this was a historical building, additional building codes were involved. These regulations often caused overall project delays. However, Goley had the proper manpower coverage to offset any timing setbacks.
- Expertise: Due to design nuances and specifications, the work necessitated applying out-of-ordinary materials in unique applications.
- Mobility: The downtown location, which was in a neighborhood, necessitated that a contractor could work through logistical challenges, such as scheduling and delivering materials to the jobsite. Goley worked within limited time constraints to make the work happen.
- Focus and collaboration: To meet timeline shifts, there were many trades on the job at once—so it was critical that the insulation subcontractor could effectively work alongside others. Our crewmembers are well-versed in maintaining focus in fast-paced, demanding settings.
“When we use Goley, we have dependability. They don’t leave anything out when they complete a bid, and they are easy to communicate with. They make sure the men are there when we need them there on the job.”
– Large Regional Interior Contractor, Customer for over 30 years


The Result
To ensure success on this project, our team:
- Accommodated timeline shifts by placing more installers on the jobsite and working overtime
- Worked alongside many other trades on the job
- Effectively applied a range of special order materials
This work was completed for a large interior contractor that we’ve been partnering with for decades. They reported complete satisfaction with the job, and there were no callbacks.

Project Details
+35,000 sq./ft. of Rockwool
Oct 2018 – Jun 2019
4 Crew Members
+6,000 l./f. Fire/Acoustical Head of Wall Sealant
+100 rooms
+57,000 Gross sq./ft.
+66,000 sq./ft. of Fiberglass
3 Stories